Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in excavation Partly in excavation and partly in embankment Fully in embankment All of these Fully in excavation Partly in excavation and partly in embankment Fully in embankment All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Liter for capacity Meter for length Cubic metre for area Square meters for volume Liter for capacity Meter for length Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d ANSWER DOWNLOAD EXAMIANS APP