Estimating and Costing The most reliable estimate is Detailed estimate Cube rate estimate Preliminary estimate Plinth area estimate Detailed estimate Cube rate estimate Preliminary estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Availability of materials Transportation of materials Quantity of the materials All of these Availability of materials Transportation of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Height, breadth, length Length, breadth, height Breadth, length, height None of these Height, breadth, length Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.50 m³ 1.00 m³ 1.25 m³ 1.75 m³ 1.50 m³ 1.00 m³ 1.25 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall ANSWER DOWNLOAD EXAMIANS APP