Estimating and Costing The plinth area of a building not includes Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every 30 m intervals At every change of direction At every change of gradient All of these At every 30 m intervals At every change of direction At every change of gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP