Estimating and Costing The plinth area of a building not includes Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The mean depth is the average of depths of two consecutive sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every change of gradient At every change of direction At every 30 m intervals All of these At every change of gradient At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Hexagonal buildings All of these Octagonal buildings Circular buildings Hexagonal buildings All of these Octagonal buildings Circular buildings ANSWER DOWNLOAD EXAMIANS APP