Estimating and Costing The plinth area of a building not includes Area of the walls at the floor level Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The mean depth is the average of depths of two consecutive sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient All of these At every 30 m intervals At every change of direction At every change of gradient All of these At every 30 m intervals At every change of direction ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Top of P trap W.C. Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. Side of water closet Main soil pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings ANSWER DOWNLOAD EXAMIANS APP