Construction Planning and Management The time with which direct cost does not reduce with the increase in time is known as Crash time Optimistic time Normal time Standard time Crash time Optimistic time Normal time Standard time ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Time and progress chart of a construction, is also known as Gantt chart Modified Mile stone chart Bar chart All listed here Gantt chart Modified Mile stone chart Bar chart All listed here ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Railway projects are treated as Light construction Heavy construction None of these Industrial construction Light construction Heavy construction None of these Industrial construction ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be Less than X More than X Any of the above Equal to X Less than X More than X Any of the above Equal to X ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Various activities of a project, are shown on bar charts by Vertical lines Horizontal lines Crosses Dots Vertical lines Horizontal lines Crosses Dots ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management The main principle of an organization, is Unity of command Delegation of authority All listed here Effective control at all levels Unity of command Delegation of authority All listed here Effective control at all levels ANSWER DOWNLOAD EXAMIANS APP