Power Systems Which of the following power stations is mainly used to cover peak load on the system? gas based thermal power plant coal based thermal power plant pumped storage hydro power plant nuclear plant gas based thermal power plant coal based thermal power plant pumped storage hydro power plant nuclear plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is Impeller Francis Kaplan Pelton Impeller Francis Kaplan Pelton ANSWER DOWNLOAD EXAMIANS APP
Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 20 10 4 8 20 10 4 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is hydro power plant nuclear plant thermal plant pumped storage plant hydro power plant nuclear plant thermal plant pumped storage plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 750 kW 300 kW 250 kW 500 kW 750 kW 300 kW 250 kW 500 kW ANSWER DOWNLOAD EXAMIANS APP