Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is hydro power plant nuclear plant thermal plant pumped storage plant hydro power plant nuclear plant thermal plant pumped storage plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because both 1 and 2 short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents nether 1 nor 2 both 1 and 2 short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Per unit of any quantity is defined as base value of quantity /actual value of quantity in same units actual value of quantity /base value of quantity in same units actual value of quantity /base value of quantity in different units base value of quantity /actual value of quantity in different units base value of quantity /actual value of quantity in same units actual value of quantity /base value of quantity in same units actual value of quantity /base value of quantity in different units base value of quantity /actual value of quantity in different units ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which power plant cannot have single unit of 100 MW capacity Hydro electric power plant. Nuclear power plant. Steam power plant. Diesel engine plant. Hydro electric power plant. Nuclear power plant. Steam power plant. Diesel engine plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The term self GMD is used to calculate resistance inductance capacitance both 1 and 2 resistance inductance capacitance both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP