Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 4 10 20 8 4 10 20 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Direct conversion of heat energy into electrical energy is possible through Both A and C. Fuel or solar cell. MHD generator. Thermal converters. Both A and C. Fuel or solar cell. MHD generator. Thermal converters. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The unit protection scheme provides back up protection. simultaneous protection. primary protection. remote protection. back up protection. simultaneous protection. primary protection. remote protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Generator. Ash handling plant. Turbine. Coal handling plant. Generator. Ash handling plant. Turbine. Coal handling plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 45° 90° 42° 36° 45° 90° 42° 36° ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10^-6∠90° ℧. Find the shunt reactor required for compensating ferranti effect? 3000 Ω 1500 Ω 500 Ω 2000 Ω 3000 Ω 1500 Ω 500 Ω 2000 Ω ANSWER DOWNLOAD EXAMIANS APP