Power Systems In a steam power plant, the feed water coming to the economizer is heated plant the feed water coming to the economizer is heated using HP steam. flue gas. direct heat in the furnace. LP steam. HP steam. flue gas. direct heat in the furnace. LP steam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 500 900 250 450 500 900 250 450 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 15. 25. 50. 10. 15. 25. 50. 10. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A fault occurring at the terminals of an unloaded synchronous generator operating at its rated voltage has resulted in the following values of currents and voltages. IR0 = j 2.37 pu IR1 = -j 3.05 pu IR2 = j 0.68 pu VR0 = VR1 = VR2 = 0.237 pu. Which of the following faults has occurred? LLL LLG LL LG LLL LLG LL LG ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Direct laying. Draw - in - system / duct - pipe laying. None of these. Both A and B. Direct laying. Draw - in - system / duct - pipe laying. None of these. Both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The term self GMD is used to calculate both 1 and 2 inductance resistance capacitance both 1 and 2 inductance resistance capacitance ANSWER DOWNLOAD EXAMIANS APP