Power Systems
The method of neutral grounding affects the

 zero sequence network
 negative sequence network
All of these
 positive sequence network

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In hydroelectric power plants

 both operating and initial cost are low.
 both operating and initial cost are high.
  operating cost is low and initial cost is high.
 operating cost is high and initial cost is low.

ANSWER DOWNLOAD EXAMIANS APP