Power Systems Which of the following plants is/are base load plants run off river both 1 and 2 nuclear pump storage run off river both 1 and 2 nuclear pump storage ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is none of these. transformer and transmission lines. motor. generator. none of these. transformer and transmission lines. motor. generator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Main bus bar protection scheme is /are differential protection. none of these. both fault bus and differential protection. fault bus protection. differential protection. none of these. both fault bus and differential protection. fault bus protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydraulic turbine having rated speed of 250 rpm is connected to a synchronous generator. In order to produce power at 50 Hz, the numbers of pole are required in the generator 24. 6. 12. 16. 24. 6. 12. 16. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of inductance used for compensation of arcing grounds is 1/3ω²C 3/ω²C ω²C/3 3ω²C 1/3ω²C 3/ω²C ω²C/3 3ω²C ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which following statement are not true for line parameters R, L, G and C of transmission line G = 1/R where G is conductance of line. LC = μ ε and RG = σ ε. All of above. Both R and G depend on the conductivity of conductor forming the line. G = 1/R where G is conductance of line. LC = μ ε and RG = σ ε. All of above. Both R and G depend on the conductivity of conductor forming the line. ANSWER DOWNLOAD EXAMIANS APP