Power Systems Which of the following plants is/are base load plants nuclear both 1 and 2 run off river pump storage nuclear both 1 and 2 run off river pump storage ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Pulversing unit. Ash handling unit. Condenser. Cooling tower. Pulversing unit. Ash handling unit. Condenser. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generator ratings. reactive powers. generated voltages. turbine inputs. generator ratings. reactive powers. generated voltages. turbine inputs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 720 MW. 740 MW. 730 MW. 710 MW. 720 MW. 740 MW. 730 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV 25 to 35 kV 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV 25 to 35 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems A sort line with R/X ratio 1, the zero regulation is obtained when the power factor of the load is unity 0 leading 0.707 leading 0.5 unity 0 leading 0.707 leading 0.5 ANSWER DOWNLOAD EXAMIANS APP