Power Systems A network containing 100 buses in which 10 are the voltage control buses, 5 are fixed shunt capacitor buses, 20 are the reactive power support buses, 6 are the generator buses. Find the size of the Jacobian matrix? 165 × 165 162 × 162 164 × 164 163 × 163 165 × 165 162 × 162 164 × 164 163 × 163 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to regenerative cycle. binary vapor cycle. product of boiler efficiency, turbine efficiency and generator efficiency. the Rankine cycle. regenerative cycle. binary vapor cycle. product of boiler efficiency, turbine efficiency and generator efficiency. the Rankine cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 6 16 10 2 6 16 10 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal plant most of the energy is wasted in condenser boiler ESP turbines condenser boiler ESP turbines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Binary vapor cycle are used for increasing the turbine efficiency. improving the condenser performance. All of these improving the plant efficiency. increasing the turbine efficiency. improving the condenser performance. All of these improving the plant efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Generator. Turbine. Ash handling plant. Coal handling plant. Generator. Turbine. Ash handling plant. Coal handling plant. ANSWER DOWNLOAD EXAMIANS APP