Power Systems A network containing 100 buses in which 10 are the voltage control buses, 5 are fixed shunt capacitor buses, 20 are the reactive power support buses, 6 are the generator buses. Find the size of the Jacobian matrix? 165 × 165 163 × 163 164 × 164 162 × 162 165 × 165 163 × 163 164 × 164 162 × 162 ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a lossy transmission line, the characteristic impedance does not depend on The operating frequency of the line. The load terminating the line. The conductivity of conductors. The permittivity of the dielectric separating the conductor. The operating frequency of the line. The load terminating the line. The conductivity of conductors. The permittivity of the dielectric separating the conductor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the conductor diameter decreases, inductance of the line, remains unaffected None of these increases decreases remains unaffected None of these increases decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems India’s largest thermal power station is located at Kota. Neyveli. Chandrapur. Sarni. Kota. Neyveli. Chandrapur. Sarni. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect can be compensated by which of the following series capacitor both 1 and 2 shunt reactor shunt capacitor series capacitor both 1 and 2 shunt reactor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Main bus bar protection scheme is /are none of these. fault bus protection. differential protection. both fault bus and differential protection. none of these. fault bus protection. differential protection. both fault bus and differential protection. ANSWER DOWNLOAD EXAMIANS APP