Power Systems MCB stands for minimum capacity breaker. maximum capacity breaker. miniature circuit breaker. molded circuit breaker. minimum capacity breaker. maximum capacity breaker. miniature circuit breaker. molded circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 250 MW 750 MW 500 MW 1250 MW 250 MW 750 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In boiler water reactor (BWR) there is danger of radioactive contamination of steam. enriched uranium is used as fuel. all of above. the feed water acts both coolant and a moderator. there is danger of radioactive contamination of steam. enriched uranium is used as fuel. all of above. the feed water acts both coolant and a moderator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase transmission line, each phase is supported by 3 insulated discs, maximum voltage of each disc is 20 kV. Find the operating voltage of the transmission line per phase if efficiency of string is 80.6%. 52.84 kV 48.36 kV 83.76 kV 20 kV 52.84 kV 48.36 kV 83.76 kV 20 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging current of a 400 kV line is more than that of a 220 kV line of the same length? True None of these False either 1 or 2 True None of these False either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. ANSWER DOWNLOAD EXAMIANS APP