Power Systems Which of the following method is/are more reliable? Gauss-Siedel (GS) method Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Percentage of carbon is highest in bituminous coal. anthracite coal. lignite coal. coal gas. bituminous coal. anthracite coal. lignite coal. coal gas. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following generating plants has the minimum operating cost Hydroelectric plant. Steam plant. Diesel plant. Nuclear plant. Hydroelectric plant. Steam plant. Diesel plant. Nuclear plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the load is short circuited, then reflection coefficient of voltage is 1 -2 -1 0 1 -2 -1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems High capacity generators and motors are of star connected network delta connected network star connected with grounding network any of the above star connected network delta connected network star connected with grounding network any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems One million cubic meters of water is stored in a reservoir feeding a water turbine. The density of water is 993 kg/m³. If the centre of mass of water is 50 meters above the turbine and losses are negligible, the energy produced by that volume of water is 135.3 MWhr 120 MWhr 130.2 MWhr 140 MWhr 135.3 MWhr 120 MWhr 130.2 MWhr 140 MWhr ANSWER DOWNLOAD EXAMIANS APP