Power Systems Which of the following method is/are more reliable? Gauss-Siedel (GS) method All of these Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method Gauss-Siedel (GS) method All of these Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 50 km operating at frequency of 500 Hz. Find the type of the line? medium transmission line long transmission line short transmission line any of the above medium transmission line long transmission line short transmission line any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a long transmission line, if we increase the length of the line, the parameters A and B respectively decreases and increases increases and increases increases and decreases decreases and decreases decreases and increases increases and increases increases and decreases decreases and decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where the voltage is high and current to be interrupted is low, Which of following the breaker is preferable? Vacuum CB. Air blast CB. Any of these. Oil CB. Vacuum CB. Air blast CB. Any of these. Oil CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power and the transmission line is compensated with a series capacitance of 0.5 Pu. Find the load angle with series capacitance compensation ? 35.5° 10.5° 14.5° 29° 35.5° 10.5° 14.5° 29° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Units of incremental cost is RsMW/hr Rs/hr Rs/MWhr MWhr/Rs RsMW/hr Rs/hr Rs/MWhr MWhr/Rs ANSWER DOWNLOAD EXAMIANS APP