Power Systems Which of the following method is/are more reliable? Fast Decoupled Load Flow (FDLF) method All of these Newton Raphson (NR) method Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method All of these Newton Raphson (NR) method Gauss-Siedel (GS) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is used for protection of short lines. long lines. medium lines. none of these. short lines. long lines. medium lines. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0 mH/Km 0.025 mH/Km 0.05 mH/Km 0.1 mH/Km 0 mH/Km 0.025 mH/Km 0.05 mH/Km 0.1 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which nether 1 nor 2 corona is visible with blue or violet colour corona is just initiated both 1 and 2 nether 1 nor 2 corona is visible with blue or violet colour corona is just initiated both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to convert kinetic energy of water. increase flow rate of water. all of above. reduce water hammer. convert kinetic energy of water. increase flow rate of water. all of above. reduce water hammer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on corona. lightning voltage. RI. switching voltage. corona. lightning voltage. RI. switching voltage. ANSWER DOWNLOAD EXAMIANS APP