Power Systems Which of the following method is/are more reliable? Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a pressurized water reactor the coolant water boils in the reactor core. heavy water is used as both coolant and moderator. water is used at high pressure so that it is available is liquid from at about 280° C. both B and C. the coolant water boils in the reactor core. heavy water is used as both coolant and moderator. water is used at high pressure so that it is available is liquid from at about 280° C. both B and C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is used in thermal plants Rankine cycle Joule cycle Otto cycle All of these Rankine cycle Joule cycle Otto cycle All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.6 1 0.5 0.75 0.6 1 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the inertia constant H = 10 MJ/MVA for a 50 MVA generator, the stored energy is 500 MJ 5 MJ 10 MJ 50 MJ 500 MJ 5 MJ 10 MJ 50 MJ ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 5. 1. 10. un changed. 5. 1. 10. un changed. ANSWER DOWNLOAD EXAMIANS APP