Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 300 kW 250 kW 500 kW 750 kW 300 kW 250 kW 500 kW 750 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems To protect the power transformer ( Y-Y with neutral grounded) against fault, which type of connection do the current transformers have? Y-Δ connection Δ-Y connection Y-Y connection Δ-Δ connection Y-Δ connection Δ-Y connection Y-Y connection Δ-Δ connection ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates the maximum and minimum run off during the period. All of these the discharge at any time during the period under consideration. the average run off during the period. the maximum and minimum run off during the period. All of these the discharge at any time during the period under consideration. the average run off during the period. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transmission line is most practically used in load flow analysis? either 1 or 2 Nominal ∏ nether 1 nor 2 Nominal T either 1 or 2 Nominal ∏ nether 1 nor 2 Nominal T ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is 55.56 MVAr. 40.5 MVAr. 45 MVAr. 61.73 MVAr. 55.56 MVAr. 40.5 MVAr. 45 MVAr. 61.73 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is equal to the sending end voltage any of the above less than the sending end voltage more than the sending end voltage equal to the sending end voltage any of the above less than the sending end voltage more than the sending end voltage ANSWER DOWNLOAD EXAMIANS APP