Power Systems
A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be

  2280 MW.
 3257 MW.
 1835 MW.
 2725 MW.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A CANDU reactor uses

 only fertile materials.
 highly enriched uranium as fuel and water as moderator and coolant.
 enriched uranium as fuel and ordinary water as moderator and cooler.
  natural uranium as fuel and heavy water as moderator and coolant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The draft tube is provided to

None of these
 reduce the effect of water hammer.
  increase the acting head on the water wheel.
 raise the water surface of the stream to create an artificial head.

ANSWER DOWNLOAD EXAMIANS APP