Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 3257 MW. 2280 MW. 2725 MW. 1835 MW. 3257 MW. 2280 MW. 2725 MW. 1835 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Out of the following plant categories which is not the base load power plant? Diesel. Pump storage. Nuclear. Run of river. Diesel. Pump storage. Nuclear. Run of river. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The unit protection scheme provides primary protection. simultaneous protection. back up protection. remote protection. primary protection. simultaneous protection. back up protection. remote protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For load flow studies, What are the quantities specified at load bus are P and V P and Q δ and Q V and δ P and V P and Q δ and Q V and δ ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend Speed. All of above. Working head. Nature of load. Speed. All of above. Working head. Nature of load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across bottom most unit is 10 kV and its efficiency is 90%. Find the total operating phase voltage? 45 kV 40 kV 32 kV 36 kV 45 kV 40 kV 32 kV 36 kV ANSWER DOWNLOAD EXAMIANS APP