Power Systems Ships are usually supplied power by Hydraulic turbine. Diesel engine. None of above. Steam accumulator. Hydraulic turbine. Diesel engine. None of above. Steam accumulator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 3. 7. 20. 5. 3. 7. 20. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems More efficient plants are used as peak load plant base load plant both 1 and 2 None of these peak load plant base load plant both 1 and 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflection coefficient of voltage is Rv (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is any of the above equal to the sending end voltage less than the sending end voltage more than the sending end voltage any of the above equal to the sending end voltage less than the sending end voltage more than the sending end voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are high. both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are high. ANSWER DOWNLOAD EXAMIANS APP