Power Systems

Power Systems
Example of base load stations are

  both A and B.
  thermal.
  gas turbine.
  hydro.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which turbine is ideally suited to pumped storage plants

 Pelton.
 Impeller.
  Kaplan.
 Francis.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Taking the density of water to be 1000 kg/m³, how much power would be developed by a hydro electric generator unit, assume 100% efficiency, with 1 m head and 1 m³/s discharge?

 9.81 kW
 4.45 kW
 19.60 kW
 2.90 kW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be

 1.3.
  0.83.
 0.44.
 0.25.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is

 LG
 LL
 LLL
 LLG

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is/are base load plants?

 hydro plants
 nuclear plants
All of these
 thermal plants

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑