Example of base load stations are

  both A and B.
  gas turbine.
  thermal.
  hydro.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Objectives of power system is/are

 both 1 and 2
 Cost of electrical energy per KWh is to be minimum
 Rated voltage and frequency has to be supplied to the consumers
 nether 1 nor 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Capacitance voltage transformer ( CVT ) is used to

 reduce losses in a transmission line.
  improve the power factor of the transmission.
 connect instruments on the LT side.
 none of these.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system?

 1.476 A.
  14.76 A.
 14.7 mA.
 1 A.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of following power plants will take long period in erection and installation

 Hydro Power Plant
 Gas turbine.
 Thermal.
 Nuclear.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In an interconnected power system, the most suitable power plant to meet the peak load condition is

 hydro power plant
 nuclear plant
 pumped storage plant
 thermal plant

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑