Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 5 MW 10 MW 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect can be compensated by which of the following shunt capacitor shunt reactor series capacitor both 1 and 2 shunt capacitor shunt reactor series capacitor both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The skin effect of conductor will increase when diameter decrease resistivity decrease frequency decrease All of these diameter decrease resistivity decrease frequency decrease All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plant work? Rankine cycle Bell-Coleman cycle Otto cycle Carnot cycle Rankine cycle Bell-Coleman cycle Otto cycle Carnot cycle ANSWER DOWNLOAD EXAMIANS APP