Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 5 MW 9 MW 10 MW 18 MW 5 MW 9 MW 10 MW 18 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Rankine cycle, the work output from a turbine is given by change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Francis. Impeller. Kaplan. Pelton. Francis. Impeller. Kaplan. Pelton. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Pulversing unit. Ash handling unit. Cooling tower. Condenser. Pulversing unit. Ash handling unit. Cooling tower. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is low specific speed turbine? Francis None of these Pelton Kaplan Francis None of these Pelton Kaplan ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ideal plant load cfactor is 1 less than 1 0 greater than 1 1 less than 1 0 greater than 1 ANSWER DOWNLOAD EXAMIANS APP