Power Systems Earthing switch is used for discharging residual energies All of these protection of equipment from ground faults measuring of safety voltage discharging residual energies All of these protection of equipment from ground faults measuring of safety voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the ratio of the C.T. on the H.V side of a 3 - φ star / delta 33 / 11 kV transformer if the protecting CT on the LV side has a ratio of 300 : 5 ? 150 : 4 / √3. 200 : 5 / √3. 120 : 6 / √3. 100 : 5 / √3. 150 : 4 / √3. 200 : 5 / √3. 120 : 6 / √3. 100 : 5 / √3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 750 MW 1500 MW 1250 MW 1000 MW 750 MW 1500 MW 1250 MW 1000 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed of water turbine is the speed at which the turbine develops unit horse power at all heads. a minimum horse power. unit horse power at unit head. maximum horse power. unit horse power at all heads. a minimum horse power. unit horse power at unit head. maximum horse power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 109.75 MW and PG2 = 140.25 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? All of these. Load cycle tests. Thermal stability test. Impulse tests. All of these. Load cycle tests. Thermal stability test. Impulse tests. ANSWER DOWNLOAD EXAMIANS APP