Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3.5 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems String chart is drawn between temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 7. 3. 20. 5. 7. 3. 20. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pipes carrying steam are generally of cobalt. cast iron. steel. aluminium. cobalt. cast iron. steel. aluminium. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 20 - 25 %. 15 - 20 %. 0.5 - 1.5 %. 10 - 15 %. 20 - 25 %. 15 - 20 %. 0.5 - 1.5 %. 10 - 15 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is zero infinity maximum any of the above zero infinity maximum any of the above ANSWER DOWNLOAD EXAMIANS APP