Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an electrode. moderator. coolant. fuel. electrode. moderator. coolant. fuel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? All of these. Thermal stability test. Load cycle tests. Impulse tests. All of these. Thermal stability test. Load cycle tests. Impulse tests. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Transmission line has a length of 300 km, operating at sending end voltage Vs = 1 pu, find the receiving end voltage(Vr) at no load? 0.098 pu 1.098 pu 0.98 pu 1 pu 0.098 pu 1.098 pu 0.98 pu 1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reheat cycle in thermal power plant is used to reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? fixed shunt capacitor buses voltage control buses both 1 and 2 reactive power support buses fixed shunt capacitor buses voltage control buses both 1 and 2 reactive power support buses ANSWER DOWNLOAD EXAMIANS APP