Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt resistance at receiving end shunt reactor at receiving end All of these shunt capacitor at receiving end shunt resistance at receiving end shunt reactor at receiving end All of these shunt capacitor at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching vacuum. oil. SF6. air blast. vacuum. oil. SF6. air blast. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants normally operage at high speeds Thermal. Diesel engine. Petrol engine. Hydro electric. Thermal. Diesel engine. Petrol engine. Hydro electric. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 102.5 105.2 85.5 95.5 102.5 105.2 85.5 95.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? 50 Hz 0.52 Hz -0.52 Hz 0.48 Hz 50 Hz 0.52 Hz -0.52 Hz 0.48 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines Pelton turbine and Francis turbine. None of these. Francis turbine and Kaplan turbine. Kaplan and Pelton turbine. Pelton turbine and Francis turbine. None of these. Francis turbine and Kaplan turbine. Kaplan and Pelton turbine. ANSWER DOWNLOAD EXAMIANS APP