Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Farakka. Bakreshwar. Durgapur. Katwa. Farakka. Bakreshwar. Durgapur. Katwa. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of capacitance value increasing of inductance value both 1 and 2 increasing of voltage level increasing of capacitance value increasing of inductance value both 1 and 2 increasing of voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line has its conductors at the corners of an equilateral triangle with side 3m. The diameter of each conductor is 1.63 cm. The inductance of the line per phase per km is 1.182 mH 1.232 mH 1.043 mH 1.093 mH 1.182 mH 1.232 mH 1.043 mH 1.093 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Gas turbine. Nuclear. Thermal. Hydro Power Plant Gas turbine. Nuclear. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which type of connection is employed for current transformers for the protection of delta- star connected 3-phase transformer? delta-delta star-star delta-star star-delta delta-delta star-star delta-star star-delta ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not base load power plant Pump storage. Diesel. Run water. Nuclear. Pump storage. Diesel. Run water. Nuclear. ANSWER DOWNLOAD EXAMIANS APP