Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Katwa. Farakka. Bakreshwar. Durgapur. Katwa. Farakka. Bakreshwar. Durgapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A sort line with R/X ratio 1, the zero regulation is obtained when the power factor of the load is 0.707 leading unity 0.5 0 leading 0.707 leading unity 0.5 0 leading ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 12 MW 6 MW 5 MW 10 MW 12 MW 6 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 6000 kW 7500 kW 3000 kW 3750 kW 6000 kW 7500 kW 3000 kW 3750 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 2280 MW. 3257 MW. 1835 MW. 2725 MW. 2280 MW. 3257 MW. 1835 MW. 2725 MW. ANSWER DOWNLOAD EXAMIANS APP