Power Systems Among the following which is not non conventional energy Tidal. Wind. Geothermal. Nuclear. Tidal. Wind. Geothermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called coasting time. settling time. stopping time. damping time. coasting time. settling time. stopping time. damping time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the load is short circuited, then reflection coefficient of voltage is -1 1 0 -2 -1 1 0 -2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 20 MW 5 MW 10 MW 15 MW 20 MW 5 MW 10 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LG LL LLL LLG LG LL LLL LLG ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence impedances of a transmission line are 0.5,0.5 and 1.1 pu respectively. The self (Zs) and mutual (Zm) impedances of the line will be given by Zs = 0.5 pu, Zm =0.6 pu Zs = 0.2 pu, Zm =0.7 pu Zs = 0.7 pu, Zm =0.2 pu Zs = 0.6 pu, Zm =0.5 pu Zs = 0.5 pu, Zm =0.6 pu Zs = 0.2 pu, Zm =0.7 pu Zs = 0.7 pu, Zm =0.2 pu Zs = 0.6 pu, Zm =0.5 pu ANSWER DOWNLOAD EXAMIANS APP