Power Systems Among the following which is not non conventional energy Nuclear. Wind. Geothermal. Tidal. Nuclear. Wind. Geothermal. Tidal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? both 1 and 2 None of these large requirement of computer memory large number of iterations both 1 and 2 None of these large requirement of computer memory large number of iterations ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as product of efficiencies of all stages. generator efficiency. turbine efficiency. efficiency of thermal cycle. product of efficiencies of all stages. generator efficiency. turbine efficiency. efficiency of thermal cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a 500 Hz frequency excitation, a 100 km long power line will be modelled as shunt capacitor medium transmission line any of the above long transmission line shunt capacitor medium transmission line any of the above long transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 100 buses in which 10 are the voltage control buses, 5 are fixed shunt capacitor buses, 20 are the reactive power support buses, 6 are the generator buses. Find the size of the Jacobian matrix? 162 × 162 165 × 165 164 × 164 163 × 163 162 × 162 165 × 165 164 × 164 163 × 163 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 2 16 10 6 2 16 10 6 ANSWER DOWNLOAD EXAMIANS APP