Power Systems Among the following which is not non conventional energy Nuclear. Wind. Geothermal. Tidal. Nuclear. Wind. Geothermal. Tidal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are high. both operating and initial cost are low. operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are high. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 10. 25. 15. 50. 10. 25. 15. 50. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 8.936 pu 7.936 pu 10.936 pu 9.936 pu 8.936 pu 7.936 pu 10.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect occurs under half load no load any of the above full load half load no load any of the above full load ANSWER DOWNLOAD EXAMIANS APP
Power Systems Hydro-graph is similar to energy load curve. both B and C. mass curve. load curve. energy load curve. both B and C. mass curve. load curve. ANSWER DOWNLOAD EXAMIANS APP