Power Systems Among the following which is not non conventional energy Nuclear. Geothermal. Tidal. Wind. Nuclear. Geothermal. Tidal. Wind. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 10 MW 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following effects are associated with transmission line All of these corona effect ferranti effect skin effect All of these corona effect ferranti effect skin effect ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems To reduce the radio interference which line is/are transposed? Power line None of these Both power and telecommunication lines either 1 or 2 Power line None of these Both power and telecommunication lines either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called damping time. settling time. coasting time. stopping time. damping time. settling time. coasting time. stopping time. ANSWER DOWNLOAD EXAMIANS APP