Power Systems Reheat cycle in thermal power plant is used to reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U235, U233 and Pu239. None of these. U238 and Th232. U235 and Th239. U235, U233 and Pu239. None of these. U238 and Th232. U235 and Th239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 12.2 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 10.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 10.01 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The factor affecting run off are the topography and nature of soil in the catchment area. all of above. amount of vegetation and weather condition in the catchment area. rain fall pattern, shape and size of catchment area. the topography and nature of soil in the catchment area. all of above. amount of vegetation and weather condition in the catchment area. rain fall pattern, shape and size of catchment area. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 - Φ, 33 kV oil circuit breaker is rated 1200 A, 2000 MVA, 3 s. The symmetrical breaking current is 3600 A. 104.8 kA. 1200 A. 35 kA. 3600 A. 104.8 kA. 1200 A. 35 kA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following produces the radio interference in communication lines? electro magnetic induction None of these both 1 and 2 electro static induction electro magnetic induction None of these both 1 and 2 electro static induction ANSWER DOWNLOAD EXAMIANS APP