Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Francis. Impeller. Kaplan. Pelton. Francis. Impeller. Kaplan. Pelton. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following transmission lines capacitance effect is negligible? medium transmission lines long transmission lines both 1 and 3 shoart transmission lines medium transmission lines long transmission lines both 1 and 3 shoart transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as shunt reactor any of the above series capacitor shunt capacitor shunt reactor any of the above series capacitor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW 10 MW 12 MW 5 MW 6 MW 10 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the thermal efficiency of a 240 V, 1000 W electric kettle if it brings 2 liters of water at 15° C to boiling point 15 Minutes 80.25 %. 74.56 %. 79.33 %. 78.96 %. 80.25 %. 74.56 %. 79.33 %. 78.96 %. ANSWER DOWNLOAD EXAMIANS APP