Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 6 MW 12 MW 5 MW 10 MW 6 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following transmission lines capacitance effect is negligible? long transmission lines shoart transmission lines medium transmission lines both 1 and 3 long transmission lines shoart transmission lines medium transmission lines both 1 and 3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of moderator in a nuclear reactor is to reduce the speed of neutrons. reduce temperature. absorb neutrons. stop chain reaction. reduce the speed of neutrons. reduce temperature. absorb neutrons. stop chain reaction. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plat work Bell - Coleman cycle. Rankine cycle. Carnot cycle. Otto cycle. Bell - Coleman cycle. Rankine cycle. Carnot cycle. Otto cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Binary vapor cycle are used for improving the condenser performance. improving the plant efficiency. All of these increasing the turbine efficiency. improving the condenser performance. improving the plant efficiency. All of these increasing the turbine efficiency. ANSWER DOWNLOAD EXAMIANS APP