Power Systems Plug setting of a relay can be altered by varying none of these. no. of ampere-turns. air gap of magnetic path. adjustable back up stop. none of these. no. of ampere-turns. air gap of magnetic path. adjustable back up stop. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for protection of equipment from ground faults measuring of safety voltage All of these discharging residual energies protection of equipment from ground faults measuring of safety voltage All of these discharging residual energies ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 3257 MW. 1835 MW. 2280 MW. 2725 MW. 3257 MW. 1835 MW. 2280 MW. 2725 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is Impeller Francis Pelton Kaplan Impeller Francis Pelton Kaplan ANSWER DOWNLOAD EXAMIANS APP
Power Systems Alternate formation and breakage of bubbles are called water hamming. cavitations. All of these surgfication. water hamming. cavitations. All of these surgfication. ANSWER DOWNLOAD EXAMIANS APP