Power Systems Plug setting of a relay can be altered by varying none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating cost of thermal power station is less than that of nuclear power plant. less than that of hydroelectric power plant. less than that of diesel power plant. is the same as that of nuclear power plant. less than that of nuclear power plant. less than that of hydroelectric power plant. less than that of diesel power plant. is the same as that of nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 20. 5. 7. 3. 20. 5. 7. 3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? All of these Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method Gauss-Siedel (GS) method All of these Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method Gauss-Siedel (GS) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Type of CB. Capacitance of the system. Inductance and capacitance of the system. Inductance of the system. Type of CB. Capacitance of the system. Inductance and capacitance of the system. Inductance of the system. ANSWER DOWNLOAD EXAMIANS APP