Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Quick response to load variation. Low capital cost. Capability of quick starts. All of these Quick response to load variation. Low capital cost. Capability of quick starts. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence impedances of a transmission line are 0.5,0.5 and 1.1 pu respectively. The self (Zs) and mutual (Zm) impedances of the line will be given by Zs = 0.2 pu, Zm =0.7 pu Zs = 0.5 pu, Zm =0.6 pu Zs = 0.6 pu, Zm =0.5 pu Zs = 0.7 pu, Zm =0.2 pu Zs = 0.2 pu, Zm =0.7 pu Zs = 0.5 pu, Zm =0.6 pu Zs = 0.6 pu, Zm =0.5 pu Zs = 0.7 pu, Zm =0.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the incident current? 250 A 100 A 2500 A 200 A 250 A 100 A 2500 A 200 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of reflector is to reduce the speed of the neutrons. bounce back most of the neutrons that escape from the fuel core. stop the chain reaction. none of above. reduce the speed of the neutrons. bounce back most of the neutrons that escape from the fuel core. stop the chain reaction. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is larger any of the above less zero larger any of the above less zero ANSWER DOWNLOAD EXAMIANS APP