Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Capability of quick starts. All of these Quick response to load variation. Low capital cost. Capability of quick starts. All of these Quick response to load variation. Low capital cost. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by increasing voltage level None of these reducing reactance either 1 or 2 increasing voltage level None of these reducing reactance either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On a power system network the load is increasing represents the value of impedance none of above. increase. remains constant. decrease. none of above. increase. remains constant. decrease. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 50 buses in which 10 are the voltage control buses, 6 are the generator buses. Find the size of the Jacobian matrix? 84*84 83*83 33*33 34*34 84*84 83*83 33*33 34*34 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Condition for maximum voltage regulation tanφ = R/X cosφ = R/X tanφ = X/R cosφ = X/R tanφ = R/X cosφ = R/X tanφ = X/R cosφ = X/R ANSWER DOWNLOAD EXAMIANS APP