Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Low capital cost. Capability of quick starts. All of these Quick response to load variation. Low capital cost. Capability of quick starts. All of these Quick response to load variation. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 900 250 500 450 900 250 500 450 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents nether 1 nor 2 both 1 and 2 short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents nether 1 nor 2 both 1 and 2 short circuit currents are much larger than load currents ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following materials can be used as coolant Any of above. CO2. Helium. Heavy water. Any of above. CO2. Helium. Heavy water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as any of the above shunt reactor series capacitor shunt capacitor any of the above shunt reactor series capacitor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.76 Hz 0.85 Hz -0.76 Hz -0.85 Hz 0.76 Hz 0.85 Hz -0.76 Hz -0.85 Hz ANSWER DOWNLOAD EXAMIANS APP