Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Capability of quick starts. Low capital cost. Quick response to load variation. All of these Capability of quick starts. Low capital cost. Quick response to load variation. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main advantage of the Decoupled Load Flow (DLF) as compared to the NR method is accuracy is more reduced memory requirements in storing the Jacobian elements number of iterations are less All of these accuracy is more reduced memory requirements in storing the Jacobian elements number of iterations are less All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ground capacitance existing between transmission line and ground is 4µF. Find the inductive reactance of the peterson coil for compensation of arcing grounds? 625.35 Ω 265.25 Ω 0.844 Ω 855.26 Ω 625.35 Ω 265.25 Ω 0.844 Ω 855.26 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power and the transmission line is compensated with a series capacitance of 0.5 Pu. Find the load angle with series capacitance compensation ? 35.5° 14.5° 29° 10.5° 35.5° 14.5° 29° 10.5° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transformer is used in sub station for operating a protective relay? All of these distribution transformer capacitor voltage transformer auto transformer All of these distribution transformer capacitor voltage transformer auto transformer ANSWER DOWNLOAD EXAMIANS APP
Power Systems String chart is drawn between nether 1 nor 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis both 1 and 2 nether 1 nor 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP