Power Systems Offset mho relay is used for the protection of equipment when None of these loss of excitation of the generator either 1 or 2 failure of prime mover of the generator None of these loss of excitation of the generator either 1 or 2 failure of prime mover of the generator ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the characteristic impedance of a transmission line, if impedance is 16 Ω and admittance is 0.1 mâ„§? 400 Ω 200 Ω 160 Ω 320 Ω 400 Ω 200 Ω 160 Ω 320 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called settling time. stopping time. damping time. coasting time. settling time. stopping time. damping time. coasting time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 51.61 MW. 53 MW. 52 MW. 57.5 MW. 51.61 MW. 53 MW. 52 MW. 57.5 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ships are usually supplied power by Steam accumulator. Diesel engine. Hydraulic turbine. None of above. Steam accumulator. Diesel engine. Hydraulic turbine. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 10.936 pu 7.936 pu 8.936 pu 9.936 pu 10.936 pu 7.936 pu 8.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP