Power Systems On which one of the following cycles does a modern steam power plant work? Otto cycle Rankine cycle Bell-Coleman cycle Carnot cycle Otto cycle Rankine cycle Bell-Coleman cycle Carnot cycle ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? All of these Newton Raphson (NR) method Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method All of these Newton Raphson (NR) method Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 15.9 mH 2 mH 2 H 15.9 H 15.9 mH 2 mH 2 H 15.9 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 15 MW 20 MW 80 MW 10 MW 15 MW 20 MW 80 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 220 kV system, the inductance and capacitance up to the circuit breaker location are 25 mH and 0.025 µF respectively. The value of resistor required to be connected across the breaker contacts which will give no transient oscillations, is 1000 Ω 25 Ω 500 Ω 250 Ω 1000 Ω 25 Ω 500 Ω 250 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.75 0.6 1 0.5 0.75 0.6 1 0.5 ANSWER DOWNLOAD EXAMIANS APP