Power Systems On which one of the following cycles does a modern steam power plant work? Bell-Coleman cycle Otto cycle Carnot cycle Rankine cycle Bell-Coleman cycle Otto cycle Carnot cycle Rankine cycle ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie + b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not base load power plant Nuclear. Pump storage. Run water. Diesel. Nuclear. Pump storage. Run water. Diesel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands(N) is concentrically stranded cable with total annular space filled with strands of uniform diameter is given by (if x is number of layers) N = 3x²+3x+1 N = 3x²-3x+1 N = 3x²-6x+1 N = 3x²-2x+1 N = 3x²+3x+1 N = 3x²-3x+1 N = 3x²-6x+1 N = 3x²-2x+1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a fault occurs on any feeder, the fault current is much lower than with unsectional bus bar. equal to unsectional bus bar. much higher than with unsectional bus bar. none of these. much lower than with unsectional bus bar. equal to unsectional bus bar. much higher than with unsectional bus bar. none of these. ANSWER DOWNLOAD EXAMIANS APP