Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 80 MW 10 MW 15 MW 20 MW 80 MW 10 MW 15 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stock bridge dampers are used in case hill areas to over come the which problem? increase string efficiency increase power factor unequal ice loading All of these increase string efficiency increase power factor unequal ice loading All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Bhaba. Kalpakkam. Tarapur. Rana pratap sagar. Bhaba. Kalpakkam. Tarapur. Rana pratap sagar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on lightning voltage. switching voltage. corona. RI. lightning voltage. switching voltage. corona. RI. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a three-phase system, when the loads are perfectly balanced, the neutral current is one - third of minimum. two - thirds of maximum. zero. one - third of maximum. one - third of minimum. two - thirds of maximum. zero. one - third of maximum. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines None of these. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. Francis turbine and Kaplan turbine. None of these. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. Francis turbine and Kaplan turbine. ANSWER DOWNLOAD EXAMIANS APP