Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 80 MW 20 MW 10 MW 15 MW 80 MW 20 MW 10 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line has its conductors at the corners of an equilateral triangle with side 3m. The diameter of each conductor is 1.63 cm. The inductance of the line per phase per km is 1.232 mH 1.182 mH 1.093 mH 1.043 mH 1.232 mH 1.182 mH 1.093 mH 1.043 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line long transmission line any of the above medium transmission line short transmission line long transmission line any of the above medium transmission line short transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor of a 10 Km long single phase, two wire line are separated by a distance of 1.5 m the diameter of each conductor the inductance of the circuit is 23.33 mH. 25.8 mH. 23.8 mH. 21.2 mH. 23.33 mH. 25.8 mH. 23.8 mH. 21.2 mH. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Nuclear. Thermal. Gas turbine. Hydro Power Plant Nuclear. Thermal. Gas turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° ℧. Find Charging current under no load? 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase 0.344∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase 0.344∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP