Power Systems Find the surge impedance of a line when inductance is 160 mH and capacitance is 1µF? 200 Ω 400 Ω 800 Ω 160 Ω 200 Ω 400 Ω 800 Ω 160 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main advantage of the Decoupled Load Flow (DLF) as compared to the NR method is number of iterations are less reduced memory requirements in storing the Jacobian elements accuracy is more All of these number of iterations are less reduced memory requirements in storing the Jacobian elements accuracy is more All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Katwa. Bakreshwar. Farakka. Durgapur. Katwa. Bakreshwar. Farakka. Durgapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across the bottom most unit is 33.33% of total voltage. Its string efficiency is 25% 33.33% 75% 66.66% 25% 33.33% 75% 66.66% ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Minimum load station. Base load station. None of above. Peak load station. Minimum load station. Base load station. None of above. Peak load station. ANSWER DOWNLOAD EXAMIANS APP