Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.6 0.75 0.5 1 0.6 0.75 0.5 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has (2 + j4)Ω impedance, 100 MVA and base voltage is 10 KV. Find the per unit impedance value of transmission line? (1 + j2 ) pu (0.5 + j1 ) pu (2 + j4 ) pu (4 + j8 ) pu (1 + j2 ) pu (0.5 + j1 ) pu (2 + j4 ) pu (4 + j8 ) pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of slack bus are P and Q V and δ P and V P and δ P and Q V and δ P and V P and δ ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following are the fertile materials U238 and Th232. U233 and Pu239. U238 and Th239. U238 and Pu239. U238 and Th232. U233 and Pu239. U238 and Th239. U238 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A guard ring is used in string type insulator having 3 units to improve string efficiency. Find the capacitance of metal link 2 if pin to earth capacitance of each unit is 1 F? 0.5 F 1 F 2 F 4 F 0.5 F 1 F 2 F 4 F ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 200, 100 100, 200 175, 125 150, 150 200, 100 100, 200 175, 125 150, 150 ANSWER DOWNLOAD EXAMIANS APP