Power Systems A guard ring is used in string type insulator having 3 units to improve string efficiency. Find the capacitance of metal link 2 if pin to earth capacitance of each unit is 1 F? 4 F 2 F 0.5 F 1 F 4 F 2 F 0.5 F 1 F ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to binary vapor cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. binary vapor cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. kinetic energy of the running water is fully utilized. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Gas-turbine. Nuclear. Thermal. Hydro Power Plant Gas-turbine. Nuclear. Thermal. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Differential relays does not used for which of the following faults? faults within a generator faults within a transformer through faults both 1 and 2 faults within a generator faults within a transformer through faults both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Inductance of transmission line will decrease when GMD decrease and GMR increase GMD increase and GMR decrease both GMD and GMR decrease both GMD and GMR increase GMD decrease and GMR increase GMD increase and GMR decrease both GMD and GMR decrease both GMD and GMR increase ANSWER DOWNLOAD EXAMIANS APP