Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 7 3 2 5 7 3 2 5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where is the draft tube of a hydroelectric plant that is an airtight pipe located Near the surge tank. In between the penstock and runner. In between the runner exhaust and the tail race. At the beginning of the penstock. Near the surge tank. In between the penstock and runner. In between the runner exhaust and the tail race. At the beginning of the penstock. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Isolator in sub station is open under ------------- condition? no load full load short circuit any of the above no load full load short circuit any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Generation of of one watt needs about ______________ fission per second 3.1 × 106. 3.1 × 107. 3.1 × 1010. 3.1. 3.1 × 106. 3.1 × 107. 3.1 × 1010. 3.1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Boiler. Condenser. Super heater. Steam turbine. Boiler. Condenser. Super heater. Steam turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the operating head is controlled. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. ANSWER DOWNLOAD EXAMIANS APP