Power Systems The rating of fuse wire is always expressed in kWh. amperes. ampere-hours. ampere-volts. kWh. amperes. ampere-hours. ampere-volts. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Rankine cycle efficiency of a steam power plant is of 45 - 80 %. 30 - 45 %. 20 - 30 %. 60 - 80 %. 45 - 80 %. 30 - 45 %. 20 - 30 %. 60 - 80 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 10 MW 20 MW 15 MW 5 MW 10 MW 20 MW 15 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. less than that required by atomic power station of the same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. less than that required by atomic power station of the same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Proximity effect depends on relative permeability distance between the conductors All of these frequency relative permeability distance between the conductors All of these frequency ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Direct laying. Both A and B. None of these. Draw - in - system / duct - pipe laying. Direct laying. Both A and B. None of these. Draw - in - system / duct - pipe laying. ANSWER DOWNLOAD EXAMIANS APP