Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Boiler. Steam turbine. Super heater. Condenser. Boiler. Steam turbine. Super heater. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems String chart is drawn between nether 1 nor 2 T on Y-axis and S and T on on X-axis both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis nether 1 nor 2 T on Y-axis and S and T on on X-axis both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the incident current? 2500 A 250 A 200 A 100 A 2500 A 250 A 200 A 100 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Type of CB. Inductance and capacitance of the system. Inductance of the system. Capacitance of the system. Type of CB. Inductance and capacitance of the system. Inductance of the system. Capacitance of the system. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton turbine is a ----------- turbine inward radial flow axial flow any of the above impulsive inward radial flow axial flow any of the above impulsive ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 1 0.6 0.5 0.75 1 0.6 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP