Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Boiler. Steam turbine. Condenser. Super heater. Boiler. Steam turbine. Condenser. Super heater. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 250 MW 500 MW 750 MW 1250 MW 250 MW 500 MW 750 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm Xs +2 Xm Xm - Xs 2Xs + Xm Xs - Xm Xs +2 Xm Xm - Xs 2Xs + Xm ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plat work Rankine cycle. Otto cycle. Bell - Coleman cycle. Carnot cycle. Rankine cycle. Otto cycle. Bell - Coleman cycle. Carnot cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 5 8 2 6 5 8 2 6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 50 Hz, 17.32 kV generator is connected to a power system. The system reactance and capacitance per phase are 10 mH and 0.2 mF respectively. What is the maximum voltage across the contacts of the circuit breaker at an instant when it passes through zero? 31.28 kV 29.28 kV 30.28 kV 28.28 kV 31.28 kV 29.28 kV 30.28 kV 28.28 kV ANSWER DOWNLOAD EXAMIANS APP