• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
Pelton turbine is a ----------- turbine

 any of the above
 impulsive
 inward radial flow
 axial flow

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Non-commercial sources of energy are

  wood, animal wastes and agricultural wastes.
None of these
 solar, wind and biomass.
 fossil fuel, hydro power and nuclear power.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Water hamming process in pen-stocks results in

  pressure increases.
None of these
  noise increases, pressure increases, velocity decreases.
  noise increases.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The main objectives of power system is/are

All of these
 Flexible power has to be available.
 Cost of electrical energy per KWh is to be minimum
 Reliable power has to be available

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is

 20 sec.
 none of these.
  5 sec.
 10 sec.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Condition for zero voltage regulation is

 cosφ = X/R
 cosφ = R/X
 tanφ = R/X
 tanφ = X/R

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑