• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
Pelton turbine is a ----------- turbine

 impulsive
 inward radial flow
 axial flow
 any of the above

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The essential requirement(s) for power plants to be operated as peak load plants are

All of these
 Low capital cost.
 Capability of quick starts.
 Quick response to load variation.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time?

 0.85 Hz
 0.76 Hz
 -0.76 Hz
 -0.85 Hz

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If we increase the spacing between the phase conductors, the value of line inductance

 decrease
 remains unaffected
None of these
 increase

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Location of a surge tank, in an hydro electric power station is near

  turbine.
 dam.
 reservoir.
 tail race.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following statements is/are true? In case of parallel transmission lines

 fault current increases
 stability increases
 both 1 and 3
 fault current reduces

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑