Power Systems String chart is drawn between nether 1 nor 2 T on Y-axis and S and T on on X-axis both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis nether 1 nor 2 T on Y-axis and S and T on on X-axis both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis ANSWER DOWNLOAD EXAMIANS APP
Power Systems An unloaded generator with a pre-fault voltage 1 pu has the following sequence impedance: Z0 = j 0.15 pu, Z1 = Z2 = j 0.25 pu The neutral is grounded with a reactance of 0.05 pu. The fault current in pu for single line to ground fault is 2.5 pu 7.25 pu 3.75 pu 4.28 pu 2.5 pu 7.25 pu 3.75 pu 4.28 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which cooling is preferred for large turbine generator Hydrogen cooling. Nitrogen cooling. None of these. Oxygen cooling. Hydrogen cooling. Nitrogen cooling. None of these. Oxygen cooling. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 4 bus,4×4 Y bus matrix the number of non zero elements are 12. Find the number of transmission lines? 5 8 2 4 5 8 2 4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of electrical power transmission is/are nether 1 nor 2 Voltage regulation of the transmission line must be zero or minimum Transmission system must be more efficient with minimum line losses both 1 and 2 nether 1 nor 2 Voltage regulation of the transmission line must be zero or minimum Transmission system must be more efficient with minimum line losses both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the length of the transmission line, the charging current increases None of these decreases remains unaffected increases None of these decreases remains unaffected ANSWER DOWNLOAD EXAMIANS APP