Power Systems String chart is drawn between temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of a 100 bus interconnected system is 90% sparse. Then find the number of non zero elements in the Y bus matrix? 90 1000 10 9000 90 1000 10 9000 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which statement is not correct for the transmission line parameter R, L, G and C The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog G = I/R. R is the AC resistance per unit length of conductor C. The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog G = I/R. R is the AC resistance per unit length of conductor C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Attenuation occurs due to both 1 and 3 inductance resistance conductance both 1 and 3 inductance resistance conductance ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Francis turbine runner, the number blades is usually of the order of 12 - 14. 16 - 24. 6 - 8. 3 - 6. 12 - 14. 16 - 24. 6 - 8. 3 - 6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. ANSWER DOWNLOAD EXAMIANS APP