Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 35° 60° 30° 45° 35° 60° 30° 45° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from mass Curve. flow duration curve. both B and C. hydro-graph. mass Curve. flow duration curve. both B and C. hydro-graph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 90° 45° 42° 36° 90° 45° 42° 36° ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for miniature circuit breaker. maximum capacity breaker. molded circuit breaker. minimum capacity breaker. miniature circuit breaker. maximum capacity breaker. molded circuit breaker. minimum capacity breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation to have large size thermal plant located near coal fields. to have large number of small size thermal plants located at different places. none of above. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. to have large number of small size thermal plants located at different places. none of above. to have large size thermal plants near load centre. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Tarapur nuclear power plant has which type of reactor? CANDU type reactors. Pressurized water reactors. Boiling water type. None of these. CANDU type reactors. Pressurized water reactors. Boiling water type. None of these. ANSWER DOWNLOAD EXAMIANS APP