Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 45° 60° 35° 30° 45° 60° 35° 30° ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for minimum capacity breaker. molded circuit breaker. maximum capacity breaker. miniature circuit breaker. minimum capacity breaker. molded circuit breaker. maximum capacity breaker. miniature circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The economics of power plant is greatly influenced by load factor diversity factor both 1 and 2 nether 1 nor 2 load factor diversity factor both 1 and 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems String efficiency depends upon voltage rating of whole string. all of these. no. of SCR in the string. voltage rating of one SCR. voltage rating of whole string. all of these. no. of SCR in the string. voltage rating of one SCR. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Hydro Power Plant Gas-turbine. Nuclear. Thermal. Hydro Power Plant Gas-turbine. Nuclear. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.83. 0.25. 1.3. 0.44. 0.83. 0.25. 1.3. 0.44. ANSWER DOWNLOAD EXAMIANS APP