Power Systems The rate of rise of re-striking voltage is dependent upon resistance of the system only capacitance of the system only both 1 and 2 inductance of the system only resistance of the system only capacitance of the system only both 1 and 2 inductance of the system only ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 1 0.75 0.6 0.5 1 0.75 0.6 0.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Rankine cycle, the work output from a turbine is given by change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. change in internal energy between inlet and outlet. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Proximity effect is more in case of same in both cases over head lines None of these power cables same in both cases over head lines None of these power cables ANSWER DOWNLOAD EXAMIANS APP
Power Systems The capacitance of an overhead transmission line increases with both 1 and 2 neither 1 nor 2 increase in mutual geometrical mean distance increase in height of conductors above ground both 1 and 2 neither 1 nor 2 increase in mutual geometrical mean distance increase in height of conductors above ground ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power stations is mainly used to cover peak load on the system? pumped storage hydro power plant coal based thermal power plant gas based thermal power plant nuclear plant pumped storage hydro power plant coal based thermal power plant gas based thermal power plant nuclear plant ANSWER DOWNLOAD EXAMIANS APP