Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 450 900 500 250 450 900 500 250 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 30 MW 72 MW 50 MW 720 MW 30 MW 72 MW 50 MW 720 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 15 MW 10 MW 5 MW 20 MW 15 MW 10 MW 5 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. ANSWER DOWNLOAD EXAMIANS APP
Power Systems How to find the total number of strands (N) when number of layers (x) are given Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² - 3x + 1 Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² + 3x - 1 Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² - 3x + 1 Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² + 3x - 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is any of the above larger less zero any of the above larger less zero ANSWER DOWNLOAD EXAMIANS APP