Power Systems Maximum power capacity of a transmission line can be increased by either 1 or 2 nether 1 nor 2 decreasing reactance value increasing voltage level either 1 or 2 nether 1 nor 2 decreasing reactance value increasing voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems The factor affecting run off are rain fall pattern, shape and size of catchment area. all of above. amount of vegetation and weather condition in the catchment area. the topography and nature of soil in the catchment area. rain fall pattern, shape and size of catchment area. all of above. amount of vegetation and weather condition in the catchment area. the topography and nature of soil in the catchment area. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Power station. Pumped storage. Nuclear power station. Thermal power station. Power station. Pumped storage. Nuclear power station. Thermal power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 10. un changed. 5. 1. 10. un changed. 5. 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants is/are base load plants pump storage nuclear run off river both 1 and 2 pump storage nuclear run off river both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? By increasing of temperature, tension decrease sag increase both 1 and 2 neither 1 nor 2 tension decrease sag increase both 1 and 2 neither 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP