Power Systems The main objectives of power system is/are All of these Reliable power has to be available Flexible power has to be available. Cost of electrical energy per KWh is to be minimum All of these Reliable power has to be available Flexible power has to be available. Cost of electrical energy per KWh is to be minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 95.5 85.5 105.2 102.5 95.5 85.5 105.2 102.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the line capacitance decreases None of these increases remains unaffected decreases None of these increases remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass of the fuel is the amount required to make the multiplication factor 0.5. equal to factor. more than 1. less than 1. 0.5. equal to factor. more than 1. less than 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Condenser. Wind turbine. Pulverising unit. Cooling tower. Condenser. Wind turbine. Pulverising unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has an impedance of (2+j6) Ω has voltage regulation of 10% at a load power factor of 0.8 lag. Find the voltage regulation for a load of 0.6 lead -6.92% 6.92% 10% -10% -6.92% 6.92% 10% -10% ANSWER DOWNLOAD EXAMIANS APP