Power Systems The main objectives of power system is/are Flexible power has to be available. Cost of electrical energy per KWh is to be minimum Reliable power has to be available All of these Flexible power has to be available. Cost of electrical energy per KWh is to be minimum Reliable power has to be available All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a steam power plant, the feed water coming to the economizer is heated plant the feed water coming to the economizer is heated using direct heat in the furnace. flue gas. LP steam. HP steam. direct heat in the furnace. flue gas. LP steam. HP steam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a power system with negligible resistance, the fault current at a point is 8.00 pu. The series reactance is to be included at the fault point to limit the short circuit. current to 5.00 pu is 0.125 pu. 3.000 pu. 0.200 pu. 0.075 pu. 0.125 pu. 3.000 pu. 0.200 pu. 0.075 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of inductance value increasing of capacitance value increasing of voltage level both 1 and 2 increasing of inductance value increasing of capacitance value increasing of voltage level both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the function of economiser in steam boilers improving thermal efficiency collect ash particals cooling All of these improving thermal efficiency collect ash particals cooling All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is 5. 20. 10. 55.1. 5. 20. 10. 55.1. ANSWER DOWNLOAD EXAMIANS APP