Power Systems Ideal plant load cfactor is 0 1 less than 1 greater than 1 0 1 less than 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching vacuum. air blast. SF6. oil. vacuum. air blast. SF6. oil. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 20 - 25 mm. 40 mm. 300 mm. 200 - 205 mm. 20 - 25 mm. 40 mm. 300 mm. 200 - 205 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 720 MW 50 MW 30 MW 72 MW 720 MW 50 MW 30 MW 72 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. the height of water level in the river where the storage is provided. all of above. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. the height of water level in the river where the storage is provided. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following configuration power transferability is higher? same in both configuration None of these horizontal configuration triangular configuration same in both configuration None of these horizontal configuration triangular configuration ANSWER DOWNLOAD EXAMIANS APP