Power Systems Ideal plant load cfactor is less than 1 1 0 greater than 1 less than 1 1 0 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 layer, total diameter of an ACSR conductor is 5 cm. Find the diameter of each strand? 5 cm 15 cm 1.5 cm 1 cm 5 cm 15 cm 1.5 cm 1 cm ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a neutral point of 3 - Φ system is directly connected to earth then it has what type of grounding? Resistance. Peterson coil. Solid. Reactance. Resistance. Peterson coil. Solid. Reactance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for molded circuit breaker. minimum capacity breaker. miniature circuit breaker. maximum capacity breaker. molded circuit breaker. minimum capacity breaker. miniature circuit breaker. maximum capacity breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the function of economiser in steam boilers improving thermal efficiency collect ash particals cooling All of these improving thermal efficiency collect ash particals cooling All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a transformer is loaded, the secondary terminal voltage gains. That means power factor is lagging. zero. unity. leading. lagging. zero. unity. leading. ANSWER DOWNLOAD EXAMIANS APP