Power Systems Ideal plant load cfactor is greater than 1 1 0 less than 1 greater than 1 1 0 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Pulverising unit. Condenser. Wind turbine. Cooling tower. Pulverising unit. Condenser. Wind turbine. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relays are used for the protection of which of the following lines? short transmission lines only None of these medium transmission lines only long transmission lines only short transmission lines only None of these medium transmission lines only long transmission lines only ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 28 %. 56 %. 14 %. None of above 28 %. 56 %. 14 %. None of above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Half life is defined as the time required to spiliting of a heavy nucleus. none of above. the time required for full of atoms in a specimen disintegrate. the time required for one half of isotope to decay. the time required to spiliting of a heavy nucleus. none of above. the time required for full of atoms in a specimen disintegrate. the time required for one half of isotope to decay. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 50 MW 72 MW 30 MW 720 MW 50 MW 72 MW 30 MW 720 MW ANSWER DOWNLOAD EXAMIANS APP