Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Gauss constant Acceleration factor Lagrange multiplier Blocking factor Gauss constant Acceleration factor Lagrange multiplier Blocking factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following quantities are to be calculated for generator bus? Q and δ P and V δ and V P and Q Q and δ P and V δ and V P and Q ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 4.68 msec 1.47 msec 9.68 2.63 msec 4.68 msec 1.47 msec 9.68 2.63 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the transmitted voltage? 36. 36 kV 18.18 kV 30.6 Kv 100 kV 36. 36 kV 18.18 kV 30.6 Kv 100 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of shunt compensation is/are It requires less maintanance single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation All of these It requires less maintanance single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power station that does not requier any moving part is Thermonic convertor. Tidal power generation. Wind power generation. Solar power generation. Thermonic convertor. Tidal power generation. Wind power generation. Solar power generation. ANSWER DOWNLOAD EXAMIANS APP