Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Blocking factor Lagrange multiplier Gauss constant Acceleration factor Blocking factor Lagrange multiplier Gauss constant Acceleration factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following is a medium and low head turbines Francis and Kaplan turbines. None of above. Pelton and Kaplan turbines. Kaplan and Francis turbines. Francis and Kaplan turbines. None of above. Pelton and Kaplan turbines. Kaplan and Francis turbines. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Corona is accompanied by power loss and interference hissing sound All of these violet visible light power loss and interference hissing sound All of these violet visible light ANSWER DOWNLOAD EXAMIANS APP
Power Systems Generation of of one watt needs about ______________ fission per second 3.1 × 1010. 3.1. 3.1 × 106. 3.1 × 107. 3.1 × 1010. 3.1. 3.1 × 106. 3.1 × 107. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances are 0.8 and 0 pu respectively. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.6 and 0.6 pu 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.8 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.8 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generated voltages. generator ratings. turbine inputs. reactive powers. generated voltages. generator ratings. turbine inputs. reactive powers. ANSWER DOWNLOAD EXAMIANS APP