Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Blocking factor Lagrange multiplier Acceleration factor Gauss constant Blocking factor Lagrange multiplier Acceleration factor Gauss constant ANSWER DOWNLOAD EXAMIANS APP
Power Systems To reduce the radio interference which line is/are transposed? either 1 or 2 None of these Power line Both power and telecommunication lines either 1 or 2 None of these Power line Both power and telecommunication lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 15 MW 10 MW 80 MW 20 MW 15 MW 10 MW 80 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Objectives of power system is/are both 1 and 2 nether 1 nor 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum both 1 and 2 nether 1 nor 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 50 km operating at frequency of 500 Hz. Find the type of the line? long transmission line short transmission line any of the above medium transmission line long transmission line short transmission line any of the above medium transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inertia constant of 100 MVA, 50 Hz, 4 pole generator is 10 MJ/MVA. If the mechanical input to the machine is suddenly raised from 50 MW to 75 MW, the rotor acceleration will be equal to 225 electrical degrees/s² 22.5 electrical degrees/s² 12.5 electrical degrees/s² 125 electrical degrees/s² 225 electrical degrees/s² 22.5 electrical degrees/s² 12.5 electrical degrees/s² 125 electrical degrees/s² ANSWER DOWNLOAD EXAMIANS APP