Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Lagrange multiplier Gauss constant Blocking factor Acceleration factor Lagrange multiplier Gauss constant Blocking factor Acceleration factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Hydro Power Plant Nuclear. Gas-turbine. Thermal. Hydro Power Plant Nuclear. Gas-turbine. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems One million cubic meters of water is stored in a reservoir feeding a water turbine. The density of water is 993 kg/m³. If the centre of mass of water is 50 meters above the turbine and losses are negligible, the energy produced by that volume of water is 135.3 MWhr 130.2 MWhr 140 MWhr 120 MWhr 135.3 MWhr 130.2 MWhr 140 MWhr 120 MWhr ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of re-striking voltage is dependent upon inductance of the system only resistance of the system only capacitance of the system only both 1 and 2 inductance of the system only resistance of the system only capacitance of the system only both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the percentage reactance of an element is 20 % and the full load current is 50 Amp, the short circuit current will be 200 Amp. 300 Amp. 250 Amp. 350 Amp. 200 Amp. 300 Amp. 250 Amp. 350 Amp. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation to have large size thermal plant located near coal fields. none of above. to have large number of small size thermal plants located at different places. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. none of above. to have large number of small size thermal plants located at different places. to have large size thermal plants near load centre. ANSWER DOWNLOAD EXAMIANS APP