Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Blocking factor Lagrange multiplier Acceleration factor Gauss constant Blocking factor Lagrange multiplier Acceleration factor Gauss constant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is can't say very high high low can't say very high high low ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value ANSWER DOWNLOAD EXAMIANS APP
Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine total power available at the site. diversity factor for the plant. load factory at the plant. total units of energy available. total power available at the site. diversity factor for the plant. load factory at the plant. total units of energy available. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Inductance and capacitance of the system. Type of CB. Inductance of the system. Capacitance of the system. Inductance and capacitance of the system. Type of CB. Inductance of the system. Capacitance of the system. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The characteristic impedance of a transmission on line is Inversely proportional to its length. Directly proportional to square root of its length. Independent of its length. Directly proportional to its length. Inversely proportional to its length. Directly proportional to square root of its length. Independent of its length. Directly proportional to its length. ANSWER DOWNLOAD EXAMIANS APP