Power Systems The area under a flow duration curve represents total quantity of run-off during that period. total of units of energy available. total power available. maximum rate of run-off during the period. total quantity of run-off during that period. total of units of energy available. total power available. maximum rate of run-off during the period. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from mass Curve. flow duration curve. both B and C. hydro-graph. mass Curve. flow duration curve. both B and C. hydro-graph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power stations, economiser will increase the thermal efficiency reduce the thermal efficiency both 2 and 3 reduce the heat increase the thermal efficiency reduce the thermal efficiency both 2 and 3 reduce the heat ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 layer and diameter of each strand is d, then find the total diameter of ACSR conductor? 2d 5d d 3d 2d 5d d 3d ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants has the maximum eapital cost Hydro-plants. Steam plants. Diesel plants. Nuclear plants. Hydro-plants. Steam plants. Diesel plants. Nuclear plants. ANSWER DOWNLOAD EXAMIANS APP