Power Systems Find the number of strands of ACSR conductor for 3 layer transmission line? 1 7 29 19 1 7 29 19 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Nuclear. Gas turbine. Thermal. Hydro Power Plant Nuclear. Gas turbine. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 1835 MW. 2280 MW. 2725 MW. 3257 MW. 1835 MW. 2280 MW. 2725 MW. 3257 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3000 kW 6000 kW 3750 kW 7500 kW 3000 kW 6000 kW 3750 kW 7500 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. ANSWER DOWNLOAD EXAMIANS APP