Power Systems If all the sequence voltages at the fault point in a power system are equal, then the fault point is a LG LL LLG LLL LG LL LLG LLL ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 9 MW 18 MW 5 MW 10 MW 9 MW 18 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is nuclear plant thermal plant hydro power plant pumped storage plant nuclear plant thermal plant hydro power plant pumped storage plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 6 5 2 8 6 5 2 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j9 pu j6 pu j3 pu j1 pu j9 pu j6 pu j3 pu ANSWER DOWNLOAD EXAMIANS APP