Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching vacuum. SF6. oil. air blast. vacuum. SF6. oil. air blast. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 500 MW 250 MW 750 MW 1250 MW 500 MW 250 MW 750 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Condenser. Ash handling unit. Pulversing unit. Cooling tower. Condenser. Ash handling unit. Pulversing unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power level of nuclear reactor can be increase by ( K = multiplication factor ) lowering the value of K below 1 but later bringing it back to K = 1. raising the value of K above 1, but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1 and keeping it at raised value. lowering the value of K below 1 but later bringing it back to K = 1. raising the value of K above 1, but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1 and keeping it at raised value. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Normally Z bus matrix is a sparse matrix unit matrix full matrix null matrix sparse matrix unit matrix full matrix null matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a two plant system, the load is connected to plant number 2. The loss coefficients are B11,B12 are non zero ,B22 = 0 B11 is non zero,B22 = B12 = 0 B11,B22 are non zero,B12 = 0 B11,B22,B12 are non zeros B11,B12 are non zero ,B22 = 0 B11 is non zero,B22 = B12 = 0 B11,B22 are non zero,B12 = 0 B11,B22,B12 are non zeros ANSWER DOWNLOAD EXAMIANS APP