Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching air blast. SF6. vacuum. oil. air blast. SF6. vacuum. oil. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Rankine cycle efficiency of a steam power plant is of 30 - 45 %. 45 - 80 %. 20 - 30 %. 60 - 80 %. 30 - 45 %. 45 - 80 %. 20 - 30 %. 60 - 80 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 52 MW. 57.5 MW. 53 MW. 51.61 MW. 52 MW. 57.5 MW. 53 MW. 51.61 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is None of these 0 -1 1 None of these 0 -1 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the preferred type of circuit breaker(CB) to be installed in extra high voltage AC system? Bulk oil type CB Sulphur hexafluoride CB Vacuum CB Air blast CB Bulk oil type CB Sulphur hexafluoride CB Vacuum CB Air blast CB ANSWER DOWNLOAD EXAMIANS APP