Power Systems
Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching

  SF6.
  oil.
  vacuum.
  air blast.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Gross head of an hydroelectric power station is

 the height of water level in the river where the tail race is provided.
  the difference of water level between the level in storage and tail race.
 the height of water level in the river where the storage is provided.
 all of above.